This driveway pipe was just a bit too big!
|
|
|
|
|
|
|
|
|
|
New pipe was a better fit.
|
|
|
|
|
|
|
|
|
|
|
Four layers of re-bar, 156 total.
|
|
|
|
|
|
Concrete pump truck waiting on concrete
|
|
Just a little in the wheelbarrow please!
|
|
|
Every one of the 10 loads of concrete had to be tested before it was put into the foundation.
|
|
|
|
The first load of concrete going in.
|
|
|
|
|
The piers that the tower will be anchored to.
|
|
|
|
|
|
All done. Let it dry and then bury it.
|
|
|
|